As of friday still no luck with the machining of the gudgeon pin. Roy is beginning to panic a little but says that it will be with the machinist on Monday and the rebuild can continue on Tuesday. We still need the exhaust system reengineered and the sump guards made. He assures me that the man is ready as soon as the engine is rebuilt.
RHC
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment